As a Construction Manager/Owner’s Rep/ OSHPD IOR

    SJC Hospital Laboratory 16,000 SF, $6,717,000, managed construction of OSHPD regulated laboratory for 24/7 acute care hospital with emergency room

    SJC Data/Communication $50,000, oversaw data and communication installation from laboratory to hospital's Main Data Frame

    SJC Central Plant PLC $30,000, coordinated design and installation of new components for required laboratory emergency power

    SJC Hospital Pneumatic System oversaw installation of pneumatic tubing (interior/in-ground), equipment and tie-in to existing hospital system

    SJC Angio/Cath Operatory 1200 SF, $440,000, demolition and remodel of existing operatory in radiology suite, installation of $1,500,000 Siemens imaging equipment

    SJC CT Scan Operatory 600 SF, $400,000, demolition and remodel of existing operatory in radiology suite, installation of $1,200,000 Siemens CT Scan

    SJC Temporary CT Scan $118,000, parking pad and utility development adjacent to ER for mobile CT trailer

    SJC Radiology Alternatives preliminary design and presentation of alternatives to radiology suite remodel

As a Construction Manager/Owner’s Representative

    SJC DA Tenant Improvements 4,000 SF, $1,000,000, office and meeting rooms for the DA on the 5th floor, installed a fire pump and sprinkler backbone in seven-story building, managed asbestos abatement

    SJC Mental Health Project 80,000 SF, $15,000,000, added two new 2-story buildings to existing 40,000 SF facility

    California St. Sewer Line $250,000, replaced 4 blocks of 8" sanitary sewer with 12" line

    SJC Data Project $250,000, provided new data room in existing mental health facility

    SJC 132 Bed Intake Jail 44,000 SF, $8,000,000, added 132 bed intake unit, to existing jail

    SJC 911 System $60,000, modified power supply to countywide 911 system

    SJC Children's Shelter 25,000 SF, $7,000,000, design participation through design development for emergency children’s shelter

    SJC Health Plan Office $80,000, designed and installed card access and security system at new corporate headquarters

    SJC HP Site Water Project reviewed and successfully challenged change order overages

    SJC Cheadle Bldg. Demo $550,000, SJC Cheadle Building (5-story, 40,000 SF, asbestos abatement, tight downtown setting)

    SJC Mary Graham Demo $250,000, demolished SJC Mary Graham Children’s Shelter (40,000 SF, asbestos/lead abatement)

    SJC Painting Facility Demo demolished Public Works painting facilities building, abated residual hazardous material

    SJC Parking Facilities Demo supervised the demolition of abandoned building and swimming pool for parking lot development

    SJC HVAC/Low Voltage estimated at $540,000, designed HVAC utilization of new Central Plant and new Fire Alarm system for existing mental health facility

    SJC MH Parking Structure preliminary design/budgeting for two story parking structure

    SJC Jail Kitchen Study preliminary design/budgeting for jail flash freeze food facility

As a Senior Project Manager

    Oxnard Student Services Center 19,000 SF, $16,000,000, managed DSA Community College Student Services from site development through steel erected

    Ventura County Medical Center 80,000 SF, $38,000,000, managed foundation and steel erection of five story medical office building with OSHPD component, filled in as superintendent

As a Project Engineer

    Locomotive Repair facility 20,000 SF, $12,000,000, locomotive repair building, wheel truing station

    Stockton WWTP Remodel 13,000 SF, $7,000,000, added co-generation power facility to existing WWTP, added shop/office space, filled in as superintendent

    Change Order Forensics analyzed and advised on $1,000,000 of change orders at WWTP

    Lake Elsinore Value Engineering evaluated $7,000,000 grant request to expand existing WWTP

    Burlingame BART Bid prepared architectural elements component of bid for BART station

    SSF WWTP Bid prepared architectural elements component of bid for South San Francisco WWTP

As a Lead Carpenter

    Fairfield Hospital horizontal/vertical framing, sheathing

    Monroe High School horizontal/vertical framing, sheathing

    Oakland High School horizontal/vertical framing, sheathing

    Stanford Engineering Building horizontal/vertical framing

    Vallejo Church installed pine decking on 48:12 roof structure

 

C Inst Medical Lab